| Posted by Frank Orona on August 1, 2018 | |
Nice shot of the change / progress being made here. Thanks for taking this Mike!
|
| Posted by Dale Roth on August 1, 2018 | |
Does anyone have a picture of this sight before the change? That is what I would like to see. Sure is a lot of work to be done
|
| Posted by mmi16 on August 1, 2018 | |
Coordinated chaos!
|
| Posted by Michael Derrick on August 1, 2018 | |
I don't have any of my older shots scanned (still shoot slides) so I'll borrow one from my friend Brad Kindschy. This photo shows a train on NS crossing the CSX with the movable point crossing visible.
http://www.railpictures.net/photo/549706/
|
| Posted by mmi16 on August 1, 2018 | |
Suspect the rebuilding of the control point will eliminate the slip switches and movable point frogs. Very high cost items of track maintenance.
|
| Posted by Steve Larson on August 6, 2018 | |
Amazing how precise the work is. Fine photo, Michael.
|
| Posted by Kerry Douglas on August 19, 2018 | |
Dale Roth Here what the interlock look like back in Jan 2018 http://www.railpictures.net/photo/643901/
|