Posted by J. Randall Banks on March 10, 2018 
Very cool. I see, on googlemaps, that it's all double track, aside from the bridge here. I assume that the old bridge will be rehabbed so the crossing will be double tracked.
Posted by Georg TrĂ¼b on March 10, 2018 
When the new bridge will be finished, the old truss bridge will get refurbishment. Afterwards, there will be a double track for the Albula train (to and from Thusis) over both bridges with a single crossover, while there will remain a single track over the old bridge for trains to and from Ilanz-Disentis.
- Post a Comment -