Posted by Jrry on October 27, 2017 
I noticed the notches in the upper corners of the tunnel along with a modest dip in the tracks. Was this the recent effort by NS to 'raise the roof' and lower the floor of their tunnels to accommodate the double stack container trains?
- Post a Comment -