Nice shot Colin. Do you have any more? Are they fundraising for the work needed to run into Opua again? I heard that about a $ M was needed, largely due to condition of the long wood pile trestle at Taumarere. This line was formerly part of the North Auckland Line which now terminates at Otiria a few miles short of Kawakawa. It includes an old brick tunnel (ex number 14.)
|
Thanks John. I think about 5 years before finance for the piles can be replaced in the meantime the council has filled in with metal between the rails to form and use as the Cycle way of NZ. I do have some other shots and will edit and upload in a while. Some video on my youtube too.
|
|