| Posted by Deval Dragon on February 24, 2013 | |
Wow - 4 Genesis engines and they still needed a BNSF engine. How much freight, er, express was on the end of this train?
|
| Posted by gordon vincent on February 24, 2013 | |
As an engineer for Amtrak (retired) it's more than likely that all those junk electrics aren't working at all,maybe one for HEP.My old assistant engineer who works 3 and 4 between LA and Kingman,AZ told me those junkers drop like flies coming across the country.
|
| Posted by Mike Danneman on February 25, 2013 | |
The train was 22 cars long, but I believe at least one of the P42DCs had mechanical issues.
|
| Posted by C Davis on February 28, 2013 | |
Leave it to an EMD to save 4 GE's! Love the narrative and picture. Thanks for sharing.
|
|