Always nice to see photos of the trains I dispatch. Thank you for sharing!
|
Curious; the pond is frozen over, and they are loading the silo.
Is the spring thaw coming that soon?
|
Superb !
|
Yes, the shipping season on Lake Superior is done until late March so the ore is put into the dock and then a conveyor deposits them to a stockpile just off to the left (you can see two stockpile conveyor structures, the top one for loading the dock and the bottom for taking ore to the stockpile area).
|
Posted by on February 3, 2013 | |
Another superb image, love the shots from the Iron Range!
|
|