After another 2-3 feet of snow fell and as another 2 feet is expected, MMA dispatched their plow, VB 101, to clear various routes around the system. MMA B39-8Es 8522 and 8536, along with C30-7 3614 and B23-7 2000 shove the VB101 through Milo on Thursday.