A special train with the newly delivered “Flirt” 413 # 135/136 from the Serbian railroad company Železnice Srbije ran on a section of the main line from Bar to Belgrade in Serbia for the SERVRAIL travel group from Switzerland. The train was delivered in 2024, built at the Stadler plant in Siedlce/Poland, and has only covered around 20,000 kilometers. Železnice Srbije already received 21 of these trains in 2014/2015, and a repeat order of 18 units is now being delivered. The special train arrived at Branešci after a 70 kilometer trip from Prijepolje Teretna. A large part of this section can only be traveled at a maximum speed of 30 km/h due to the poor condition of the track. The journey of 70 kilometers took a good 2 1/2 hours (with two photo stops).