Sugar Road Job 2 outrunning the rain in the background towards Clewiston, pulling 20 loads for the mill. With the creation of the USSC mainline, it’s uncommon to see GP11’s running here, as they’re primarily used on the SCFE side of the operation. USSC 305 is one of the first to operate on the USSC side in a while.