“Meteoric” At 08:49 a.m., Amtrak 98(22), the Silver Meteor (MIA-NYP), is operating ahead of schedule, although it has slowed here to less than 90 mph (viz. 88.6 mph) to cross the Susquehanna River Movable Bridge (PRR, 1906) on the NEC. Once it clears PERRY interlocking, it would accelerate to 109+ mph before reaching its next station stop at Wilmington, DE (WIL) 13 minutes early, at 09:10 a.m.