The conductor of a BNSF coal train rides the rear platform back to their coal train. The story behind this is that the second locomotive, an SD70MAC had failed and the crew disconnected from their train and brought the unit to be parked on the maintenance track at Old Monroe. Then the lead locomotive was backed up 3 miles back to the siding where their train was parked.