At Reichenau-Tamins, a new 200 meter long second bridge over the Hinterrhein is beeing built, parallel to the existing from 1895. Today, the about 30 meter long middle part of the new bridge was placed with the help of the largest Liebherr crawler crane LR 1750 of Fanger company. The new bridge should be finished in autumn 2018. A RhB train with Ge 4/4 II # 623 is crossing the old bridge.