This will be the last year with the beautiful "old" push pull trains of the Jungfraubahn in the maroon-cream colors and with chrome lettering. New trains will replace them soon. Cogwheel railcar BDhe 2/4 201with cab car Bt 25, both built in 1955 by SLM, SWS and BBC as the first of a series of 10, leaving the tunnel above Eigergletscher. From here the whole line to the Jungfraujoch is in a tunnel, 7320 meter long.