Eastbound Q368 winds its 10,000 feet of train around the horseshoe curve at Mance, two miles east of the summit of Sand Patch Grade. The Mance Training Camp (red caboose) can be seen on the pinnacle in the center of the curve. The Mance Post Office (green roof) is trackside in the lower left.