Three 2-10-2 helpers at Wootton are moving back toward one of the two tunnels at the summit of Raton Pass as they return to Raton. The eastbound freight they helped reach the summit is preparing to continue downhill to Trinidad. One helper has assisted the road engine while the other two were positioned in front of the caboose.