In the fall of 1985 the Belden Hill Tunnel was being rebuilt. During the construction the D&H once again ran under the Starrucca Viaduct. Trains then reversed directions to connect with the x-Erie Conrail line to Binghamton. A U33C was the helper assisting the runaround move on this day.