It is 7:22am and the valley in which the Moffat Tunnel is located is half lit by the rising sun. A trio of BNSF DPUs brings up the tail end of a westbound coal train, which is disappearing in to t... (more)
Minutes before the sun peeks over the top of the ridge, a westbound loaded BNSF coal load approaches the signals at the west end of Tolland. Traditionally, coal loads on the Moffat head east. Howe... (more)
Fall colors are at their peek in the Colorado high country. The westbound Zephyr is running right on time through Tolland, just about two miles west of the east portal of the Moffat Tunnel.
A trio of BNSF units is leading the Denver-Provo and is about to disappear behind the rock face as it enters Tunnel 1. The train is making its way up the 2% grade from Coal Creek Canyon, through t... (more)