Hulcher crews are getting the mainline cleared. At this point they have separated the first platform from the other four units on the third 5 unit set. They have toed the set to the left, and in this photo are lifting out the truck that connected the 1st and 2nd platform, and the dozers are moving the first platform off the tracks to clear the mainline and yard lead. The train had derailed on the yard lead.