The second of two loaded trains from the Clymer, PA mine passes through a classic fall scene at Fleming Summit, just after passing through the horseshoe curve. Trains on this line go to the mine with a block of approximately 100 empties, then return as two trains of approximately 50 loads each. The Clymer line is operated sporadically, but offers some of the best scenery on the RJ Corman PA Lines operation.