The daily Kirk Yard, IN, to Waterloo, IA, manifest train is westbound as it passes thru Beth Siding with 7300 feet of train and the CN 5548 and CN 5415 for power. The train is 34 miles from the destination of Waterloo Yard. Beth Siding is located between Winthrop and Masonville on CN Dubuque Sub at MP 240.9.