CSX loaded PCB sludge train K253 on the right and CSX intermodal Q019-05 on the left roll down the mains side by side as they approach a work zone. These two trains were running at the exact same speed. After crossing the Mohawk River and clearing the work zone the intermodal will cross over in front of the sludge train at CP-169.