Switching locos due to the lack of a headlight
Western Maryland Scenic RR, Cumberland station
Awaiting a new assignment outside the hump tower
SB StL&H train passing the old flour mill
SB Amtrak crossing the White River,...... in about 8 min. will be ariving at White River Jct. station
As the rear exits Belden tunnel, the head end passes the south end of Ninevah siding, where 3 SB trains wait for this train and a Norfolk Southern runthru following behind.
SB after interchange with the CN at montreal
SB pulling out of the siding at Belden after letting 2 NB trains pass, there is 2 more SB trains in this same siding behind this train
SB StLH train with SOO power
Picking up MMID interchange
NB coal emtys