The Super Train, Babaranjang or we can call "Batu Bara Rangkaian Panjang" with The Super EMD G26, CC 202 Series, going to Muara Enim after coal unloading on Tarahan
The Hydraulic Locomotive able to cross the flood to helping Electric Locomotive unable to cross
The locomotive is at rest to wait for the duty schedule and some are being improved engine
The oldest Locomotive still able to bring the cars to be repaired in carriages Gubeng Workshop
Mutiara Selatan leaving Surabaya Gubeng Station from Bandung, and then go to Surabaya Kota Station to rest and will return evening
Pangrango Train Stopped at Parungkuda Station to up and down the passenger from Bogor to Sukabumi
Krakatau Ekspress passing Randegan Station road to Merak from Kediri