The second revenue run to Saratoga rolls SB thru the interlocking at CPC-37. The train is rolling down the Station Track onto the S&NC controlled trackage at the station at 5:54PM. CP refers to th... (more)
Current trains consist of one full length dome and a bi-level coach set with an interesting history. The car pictured was built for the Long Island RR in 1991 by Tokyu Car Corporation as one of fi... (more)