Dedicated coal train waiting for green to enter Bristol yards. Plant in background is King Pharmaceuticals.
The DPUs on 720 shove the train uphill past the Wallace signal on the eastern edge of Bristol.
A pair of midtrain units and radio control car 905919 struggle upgrade east of Speers Ferry approaching Watkins.
NS 720 grinds upgrade through the Troublesome Creek valley a short distance east of Speers Ferry.
A combination of 4-axle and 6-axle power shoves NS 720 over Horton's Summit through Sunbright, Virginia.
A loaded NS unit train #720 pauses at Roaring Branch while the pushers are coupled to the rear at Appalachia. The short bridge crosses the ex-L&N's Corbin-Norton Cumberland Valley line.
The rear of the train is still crossing the TN river in the background as the head end smokes it up through town.
NS 720 Passing Parrot Ave Atlanta
NS 720 via trackage rights on CSX crosses the Copper Creek Viaduct
EMD power leads NS 720 east on the Pokey with 102 mtys at Thacker, WV.
NS 720 coming off of the CSX and back onto home rails via the new connection track at Frisco behind ATSF 606.
NS 720 southbound on the CSX via trackage rights at Dungannon, VA.
NS 720 running on trackage rights over the CSX as it crosses Copper Creek Viaduct behind a C40-8 and a SD60I.