561 leaves a parked empty in it's snowy dust racing towards Shire Oaks through the Peters Creek interlocking.
NS 1070 head through a cut outside Shelocta on their way back to the mines right before sunrise on a foggy August morning.
NS 561, with a consist of 2 Dash 9's and 2 Ace's heads west on a snow covered Conemaugh line after MOW work had it shut down for a few hours during a heavy squall.
NS 8060 and 8042 lead a 561 back to Shire Oaks.
NS 561 heads west on the Conemaugh line on its way back to Shire Oaks.
The MGA and PC units lead an outlawed 561 back from Shelocta.
With a fresh crew on board, the Bluebird waits to head south into Shire Oaks with an empty coal train.
1070 has just pulled down to Peters Creek where it will be tied down and await a new crew.
Bluebird on the bridge, NS 1070 rolls across the OC bridge and heads for the mines of the Mon valley.
NS 561 snakes through Homestead with the Bluebird leading.
The sun popped out, and the fog started to lift just as this empty Shelocta hopper train arrived.
NS 1070 leads 561 west through Creighton.
NS 1070 leads 561 as they roll past a small farm in Clarksburg, Pa.
561 slows for a stop at Peter Creek where it will be tied down till a new crew comes on duty.