Work train staged overnight in the siding.
Fortunatly, this caboose still see's some service on work trains. It is seen here heading back to Marathon for the night after doing work at MP 67 Heron Bay Sub.
Oh how the times have changed! CP 8638 sits in the shed track at Struthers with a work train as storm clouds move in overhead.
Light worktrain power departs Marathon.
Worktrain power pulling off the shed track.
CP WHB (Work Heron Bay) pulls machines and boarding cars out of the siding at Marathon.
Ballast train staged in West Shed Track for the weekend.
Cabshot of CP SD40-2F 9019.
Work train in the siding at Coldwell.
Work train WHB (Work Heron Bay) crosses the Little Pic River.
Eastbound work train.
after the rails have been installed this extra gang has packed their cars and moves east
CP 5764 & 6612 sure show a difference in paint! This train is a small mow train with 18 air dumps and a flatcar.
CP 6024 is waiting in E yard
The boarding car train pushes into Marathon siding.