While 11,749 ft. Mt. Timpanogos looms in the distance, Utah Railway's Wildcat to Intermountain Power Project coal load curves westward along coal track #2 at Provo Yard.
With a well matched set of MK50-3s on the point, Utah Railway's Wildcat to IPP coal load tops 7440 ft. Soldier Summit on a warm and sunny March afternoon in 2012.
With 90 loads of Wildcat coal on the drawbar, Utah Railway's CUWIPJ-09 rolls timetable west through Spring Canyon. At left is Helper City's Castle Gate Subdivision, a neighborhood comprised of hom... (more)