A loaded OT-1 approaches Ray Junction with a load of copper ore bound for Hayden.
The second train for the day works upgrade at Tunnel One while making it's way towards Hayden after a two hour load out time in the mine.
The east bound 08:30 loads are seen passing through Hayden Junction while making the last up hill climb before arriving at the dumper.
East bound 08:30 loads seen between Kearny and Hayden Junction Az.
After winding it's way out of the Kelvin and Riverside area, this east bound ore load kicks it up to track speed through the middle of Kearny, Az.
CBRY 502 leads 54 loads, just west of Ray Junction, bound for the dumper at Hayden, AZ.
The Copper Basin OB-2 unloads the first half of the train into the dumper at Hayden. After dumping about half the train, the units will pull the cars through, then run around to pull the back hal... (more)
The power for the OT-1 job reverses onto their train at the Hayden Dumper and will shove the rest of it through before pulling back west and dumping the remainder of the train.
A trio of CBRY GP39s guide 53 loads towards the dumper at Hayden.
Copper Basin 502/504 emerge from Tunnel 2 in classic Arizona mountain landscape with another load of copper ore for the smelter in Hayden.
Moving along toward Hayden through the unforgiving Arizona landscape.