Fortunately I catch this moment when both railways have trains on. The DF7 moves on Jingmen Railway while the 8K on Fengsha Railway - a double-track electrified railway .
Fengsha Railway, a track through gallery.
The train is going to spend its next 8 hours to take us to Beijing.
Two trains arrived in their destination nearly at the same time and are seen unloading passengers together. The station's departure waiting hall is on the upper floor overviewing the platforms.
Just arrived at this magnificent new railway station with an impressive roof structure, after spending 3 hours on a high speed train from Guangzhou which is 1,000 km away. The two trains at the b... (more)
This is the famous view from the top of the "idiot hill" as the Chinese named it down to the Simingyi viaduct.
The C2 class narrow gauge steam locomotive number 04 of the Xilin mineral railway is getting prepared for the day work. This morning, the temperature reached approximetely -31°F.