DGNO Garland switcher
DGNO Garland switcher delivering 1 tanker car to the Sherwin Williams Paint factory.
2nd section of the ATDA westbound to KCS Dallas yard
Through freight passes local switcher.
Christmas train
KCS intermodal arriving Dallas yard has just entered yard limits.
The two ITSL SW1500's drill double stacks around Dallas Intermodal.
Four KCS engines and two NS engines sit at Dallas Intermodal awaiting their call to duty on a beautiful Texas afternoon.
A mix of Rail Generica power at the former MKT depot aka DGNO Garland turn.
Early morning light catching the ATDA slow rolling through Garland Texas
DGNO Garland switcher extra out working industries along the former MKT.
KCS 204 job waiting for Dallas yard to clear up so they can start there work with all UP power on pay back to the NS.