Train 232 is hauled through Feilding by DXB 5137 and DL 9066. The DX class (narrow gauge version of GE U23C) was introduced from 1972 and all have been re-built, the DXB being uprated to 3000Hp. ... (more)
DXB and DXC locomotives were brought back from South Island to fill in for the CNR DL class sidelined when asbestos was discovered. This MetroPort train has arrived from Auckland's Southdown term... (more)
Erection of catenary masts on the Manukau Branch which opened in April 2012 at a cost of around $50 million. It is the first new line built in Auckland since 1930. It is a mere 1.6 miles (2.5Km)... (more)
This heritage special train from Wellington to Paekakariki is marking exactly 150 years of the opening of first public railway in New Zealand. Ja 1271 was built at Hillside, Dunedin c. 1955-56, am... (more)
1271 crosses Waitangi bridge over Tutaekuri River with excursion train returning from Hastings. The train is a feature of the annual Art Deco Weekend celebrating the architectural style Napier was... (more)