June of 1996, there was no place better to see new SP power at work. The fleet of new AC4400s was almost exclusively assigned to Colorado and Utah service. A storm rages over the Plains as SP204 ... (more)
It is early June 1996 and SP164 is about 1 year old. The paint is still so fresh you can see your own reflection in the Bloody Red Nose. The locomotives are biting into the 3% at the old siding ... (more)
The shadows are starting to grow longer as late afternoon silence is broke by the Howl of SP262 East. Digging in for all it is worth, this load had one less locomotive than normal and is fighting... (more)
UP8161 lifts coal up up the 2.4% East slope of Solider Summit. Pulling Gooseneck Curve is the toughest part of the assault. This train is destined for the huge Intermountain Power Project.