The evening's Long Beach Hauler (to West Colton) is staged in Manual Yard with nine units for power (likely just utilizing the scheduled train for a power move also). Photo is taken from the Pacif... (more)
BNSF's 613 Watson Shuttle Job begins to cross the one and only grade crossing on the Alameda Corridor (E. Lomita). Between the dirt road and the constant extremely heavy truck traffic, this is a v... (more)
PHL's 1PM UP Dock Job has a long string of stacks on the coupler as it takes the Long Beach Sub and heads south into the spaghetti bowls of tracks ahead of it.
The 5AM dock job has an incredibly long cut of baretables on the coupler as it shoves up the Long Beach Sub, about to enter Union Pacific's Dolores Industrial Lead on its way to drop the empties a... (more)