Vermont Rail System utilizes trackage rights to retrieve interchange and or haulage traffic from the NECR from a siding in North Walpole, NH. If the interchange volume is high enough, in this case... (more)
Amtrak's Vermonter crosses the Lamoille River on the Georgia High Bridge on a beautiful summer morning in Northern Vermont.
VTR 263 slows as it moves towards the yard just north of Bellows Falls.
VRS train 263 enters Bellows Falls RIverside Yard limits, seen here along the Williams River causeway in Rockingham, VT.
The Pan Am Geometry FRA Train extra crosses into Vermont.
VTR train 264 heads north through Rockingham with 5 reds.
VTR train 263 enters Riverside Yard limits with four reds leading the way.
The November 7, Vermont Rail System GMRC train 263 rolls along the Connecticut River at Rockingham, Vermont, with recently repainted VTR GP38-2 206 leading CLP GP38-2 204, SD70M-2 431 and VTR GP38... (more)
The NECR Saint Albans switcher crew is seen working Italy Yard. The SD40M-2 was built as an SD45 as SSW 9058 in March 1969.
Vermont Rail Systems Burlington to Rutland train BDRD is seen emerging from the tunnel at Middlebury. Freshly painted 206 is leading the train. This locomotive was built as a straight GP38 for the... (more)
The AAPRCO special makes brief stop at Rutland yard to exchange paperwork and wye the locomotive
Vermont Railway RDHJ returns with a cut of propane cars at Lake Paran after running down the Benington Branch.
Another day, another special painted Amtrak unit. Amtrak's Vermonter has been running with Amtrak 100 & 145 on rotation for over a week at this point giving some color to the fading fall foliage.
Amtrak 145 brightens the valley as the majority of the fall foliage has finally vanished in central Vermont.
Vermont Railway RDHJ crosses the Lake Paran dam at North Bennington, VT.