A pair of phase I U28B's (in U25B carbody) pull south towards Brownsville, past US Steel's National Tube Works.
The P&LE Commuter Train lays over for the weekend at Beaver Falls.
South bound P&LE GP38's 2033/2041/2031 cross the bridge over Ten Mile Creek south of Mather, Pa.
The P&LE locomotive shops.
This was the final run of the Pittsburgh-College commuter train.
Three of P&LE's early-phase U28B's pull gons past the electric blast furnace in Braddock.
A P&LE Switch Job rolls through the Center St. interlocking; in the distance an eastbound Conrail freight waits for it's turn to cross.
GP38-2's #2055,2053 & 2059 on the ready track at Gateway Yd.
GP38's #2025/2040/2031/2029/2026 cross the Buffalo Southern RR diamond, while a BS crew waits with their RS-3 for their turn to cross.