Labor Day finds the St. Cloud local train just throttling up from being stopped waiting for opposing traffic to clear. Northstar commuter rail facility is to the right, accessed by the lead track... (more)
Burlington Northern Santa Fe’s Denver to Stockton manifest freight works upgrade at Coal Creek Canyon west of Clay, Colorado, on April 21, 2002. The head-end power is already through Tunnel 1 in... (more)
It was actually a nice day to go out and shoot, especially for it being September in Mississippi. I drove out to Byhalia to see this NB oil train sitting on the main waiting on a green signal to ... (more)
L-CHI105, with a consist ripped straight from the 90s, blasts through Lemont, IL with a BN GP50 Leading a BN SD40-2 & Warbonnet B40-8W. Making for a legendary consist.