Very short NS 168 blows past the east switch at the New Baden passing siding
W/B NS 112 with a 'modified' whiteface / horsehead scheme...trailing units are 9752 (same scheme) and GP38-2 5077
E/B NS 111 takes the hole while meeting the W/B NS 112; crewman gives the 111 a roll-by inspection
W/B NS 112 with horsehead 'catfish' 9753/9752 & hi-nose GP38-2 5077 departs New Baden after meeting NS 111
Metrolink 1005 rests at the new Shiloh/Scott station on opening day. This is the new Eastern terminus of the line. A proposed extension to the Mid-America Airport may open someday but the first t... (more)
NS 111 (on left) makes up the train while NS 223 (on right) waits to depart eastbound
An eastbound run-through stack train passes the Berkeley Yard. Could be the 24N...confirmation appreciated.
A tardy w/b NS 224 rolls thru the cornfields of Illinois enroute to St Louis/Kansas City...
E/B Metrolink crosses Shiloh Station Rd enroute to the new Scott/Shiloh Station; NS main in the foreground
Westbound 168 pulls out of the siding at New Baden after meeting the Eastbound NS 111
Eastbound 223 in Shiloh, IL this fine Wednesday morning...
Eastbound NS 24N climbs the modest grade at Belleville, IL
Westbound NS 112 at Belleville, IL
NS 168 holds the main at New Baden on this foggy Sunday morning...
NS extra M11 takes the siding on this foggy Sunday morning. He'll wait in the hole for 90 minutes for the westbound NS 224 and 168...