Summer is here, as evident by all the boats out of winter storage and back onto the River.
The other half of OHCR's Pittsburgh Division; this single SW1 works the few industries along the old Aliquippa & Southern that have sprung up on the site of old J&L Steel works. This unit is neari... (more)
Thanks to fellow RP contributor Janusz Mrozek for introducing me to this spot.
While waiting for CSX reroutes all day, this work train was a welcome unexpected move
E100s Slide Flim
Note downtown in the background
After waiting for a westbound for three hours at Sand Patch tunnel, this 359 showed up 15 mins after I hiked out. At least I got it at Keystone Viaduct
21J takes the left turn with two BNSF running 'freddy' as Pittsburgh starts to get a little color
T322 awaits it's second section to come down 17 Mile Grade while E819 prepares to cut it's train into two section as well. Because of the steep grades on the Mountain Sub there is an 80 car lenght... (more)
416's rear helpers are working hard to keep their heavy snow covered slabs under control while the head end slows to make a crew change in Rook Yard.
2784 had to came north to rescue underpowered Q433, making for this nice all standard cab lash-up when they finally got moving three hours later.