The head end of a Stockton to Barstow manifest approaches the tunnel at Walong.
H-STOBAR approaches Tehachapi Loop.
The front, middle and rear portions of a lengthy H-STOBAR manifest can be seen traversing Tehachapi Loop, putting on quite a show in the process.
The MRVWC passes over itself on Tehachapi Loop.
MRVWC snakes between Woodford and Walong.
MWCRV works towards Woodford with a rebuilt AC6000 leading.
MWCRV wraps around itself as the train snakes north on their way down the Tehachapi Loop.
Intermodals meet at Cable on the west slope of the Tanachipi Mountains.
A UP manifest is seen in various segments on Tehachapi Loop, with their DPUs about to enter the tunnel as the head end meets a BNSF grain train.
A couple DPUs bring up the rear of a manifest as they wrap around Tehachapi Loop.
A manifest passes over its West Colton bound consist in the late afternoon.
A southbound freight charges upgrade out of Woodford.
A couple GEs shove on the rear of a Central Valley bound grain train as it finishes its trip around the Loop.
After a long pause, a grain train gets back on the move as they begin to traverse the Tehachapi Loop.
A Stockton bound Z train rounds Tehachapi Loop.