Breaking into a beautiful desert sunrise, 8 units lead an autorack train out of Mojave Ca. It's 7:35AM
A yellow striped Union Pacific Gevo leads a Ex-SP tunnel motor and a UP SD40-2 Snoot over an Ex-WP Bridge in the Altamont Pass.
Just enough power to pull these single stacks over the hill.
The Hauler pulls into the Albany Yards.
Loading up on coal at Wildcat.
First train after sunrise, hits the desert sands.
A fairly new H3 Gevo cuts into the sun with a stack set. Gotta love those new Schneider containers!
Work crews get a small break while this solid grain train passes by. This view is taken from the shoulder of Highway 80.