P18-EV120-P14 on an infrastructure evaluation run from Mernda pass through West Richmond.
CLF4-CLP12-C501-CLF1 coast through Albion with a loaded SSR grain train from NSW to Appleton Dock.
CLF1-C501-CLP12-CLF4 with 7MC7 empty grain to NSW at Albion.
CLF1-C501-CLP12-CLF4 approach Jacana with 7MC5 empty SSR grain to NSW.
CLF1-C501-CLP12-4814 shunt an SSR grain consist at Appleton Dock.
CLF1-C501-852-CLP12 with an empty grain train from North Geelong approach Newport.
CLF1-4814-C501-BRM001-852 power through West Footscray with 2MC5 empty SSR grain to NSW.
CLF4-C501-4814-852-CLF1 unload an SSR grain consist at Appleton Dock.
CLF1-BRM001-C501-CLF4 with 1MC5 empty SSR grain to NSW cross the flyover at Jacana.
CSR015 with a short Sadleirs freight to Laverton at Newport.
P16-B76-B80 depart Appleton Dock with an empty grain consist to Tottenham Yard.
B80-B76-P16 unload an SSR grain consist at Appleton Dock.
CSR022 with 9743V steel wagon transfer from North Dynon arrives at Laverton.
C501-852-S303-4908-CLF1-CLF4 with 7MC5 empty SSR grain to NSW pass through Sunshine.
P17 with an empty SSR grain train from Appleton Dock to Tottenham Yard at West Footscray.