Snow, wind and cold. A westbound freight creeps out of the western portal of the Allegheny Tunnel, greeted by snow covered tracks. With the wind whipping, I was surprised I was able to keep the ... (more)
With Track 1 through the New Portage Tunnel out of service for a couple of hours, we knew that eastbounds would be routed up the steeper Track 2 grade to the Allegheny Tunnel. A long stack train o... (more)
Juniata Terminal's PRR EMD E-8's pull a 10 car consist out of the single track Portage Tunnel for another trip around Horseshoe Curve during Railfest 2007