E940 hustles empty hoppers west with a pair of BNSF units
15K splits the middle with 206 on the right headed east and an unknown unit coil steel train in the siding
83E heads down the siding to Berea to pick up a cab signal equipped unit for a leader east.
132 lead by a heavily repaired NS 3544
133 dashes in the snow by CP195
All the tracks are full on the first day of 2005 with 15K on track 1 in the middle, 16N on track 2 to the right and a Detroit Edison coal train tied down in the siding.
NS C31P caboose with NS remark using the old N from NW and a new S added on. The old W is still visible under the S.
233 leaves Williamson and heads west