A warm late afternoon in the Antelope Valley along Metrolink's Valley Subdivision finds the F125 test train with SCAX 905 tied down in the set-out track near the Vincent Grade/Acton station. For t... (more)
It's not every day you get to see an EMD F125 at the head of a 10-car train almost entirely made up of retired Bombardier cabcars. Here we see SCAX 905, the first of Metrolink's new locomotives to... (more)
Metrolink's New F125 conducts grade crossing signal testing on the Pasadena Sub. (Photo taken by railroad employee during a public event, no trespassing involved)
On June 10, 2017, California’s Metrolink conducted tests with their first operable F125. SCAX 905 was built by Electro-Motive in May 2016, and delivered to Metroli... (more)
As Metrolink 860 makes its way from Oceanside to San Bernardino it crosses the Santa Ana River as it passes from Orange to Anaheim on May 28, 2017. Cab c... (more)