On March 13, 1976, LV GP38-2 317-320-315 and GP38AC 313 push the set-out from Apollo-2 back to one of the interchange tracks as a westbound B&O train led by GP40 4054 - GP40-2 4237 and another GP4... (more)
On March 13, 1976, LV GP38-2 317-320-315 and GP38AC 313 push the set-out from Apollo-2 back to one of the interchange tracks as a westbound B&O train approaches on the CNJ. R. T. Steinbrenner Pho... (more)
With NE-1 out of the way, Apollo-2 arrives at Bound Brook, NJ and prepares to make a set-out to the CNJ on March 13, 1976. The power for AP-2 is GP38-2 317-320-315 and GP38AC 313. R. T. Steinbre... (more)
With work at South Plainfield completed, NE-1 is on its way to Allentown as it rolls around the curve at Bound Brook, NJ on March 13, 1976. R. T. Steinbrenner Photo. We did not chase to Allentow... (more)