Railpictures Photographer Chris Allen Trackside at the end of the day.
The crew pulling into LD siding. They will switch ends before heading west back to Paraco Gas and then onto Sherwood Lumber in Holtsville.
First week in March and the last snow storm of the year. GP38-2's 271 and 261 leaving two centerbeams at Blue Linx outdoors in yard.
GP38-2 271 is switching center beams into Elm Freight. Perfect pose of Elm truck.
Waiting for the garage door to open .
Delivery on the Southold Double End Freight Track for Penny Lumber. Service to this location ended when Penny Lumber was bought by Marjam. Marjam still receives service at their Farmingdale locati... (more)
Finished switching customers Southern Container and Roberts Plywood. Don and Jay waiting for the LIRR to clear up before heading up to the switch. They will head back to Pine Aire.
Last snow of the year. At Gershow Recycling the 271 is pulling up to the switch with Engineer Don Carman at the controls. Seen in the distance is Jay Eichler Conductor heading to the facility. Jay... (more)
RS 60 heading past the signals that protect movements in and out of the LIRR Ronkonkoma Yard.The signal to the left is ASC CO & eastward manual block and interlocking signal. The signal to the rig... (more)
NYA GP38-2 271 passing the LIRR Leaf Crusher with MP15AC 158 facing east on Certified siding. The crusher did not make it back to the yard after crushing leaves off the rail head. The freight is p... (more)
Switching Medford Team Track. Delivery for Triangle Lumber.