The afternoon clouds that build most summer days in this region present a challenge for photos of this new operation. Rolling SB for Saratoga at 4:41 PM, a large cloud is moving down the hillside,... (more)
The second revenue run to Saratoga rolls SB thru the interlocking at CPC-37. The train is rolling down the Station Track onto the S&NC controlled trackage at the station at 5:54PM. CP refers to th... (more)
Current trains consist of one full length dome and a bi-level coach set with an interesting history. The car pictured was built for the Long Island RR in 1991 by Tokyu Car Corporation as one of fi... (more)
The S&NC made its first revenue runs, as planned, on July 23rd. Here the second revenue run to Saratoga rolls SB thru the Adirondack countryside at the 1000 Acres golf course.
FIRST RUN! The S&NC made its first revenue runs, as planned, on July 23rd. Here the very first revenue train arrives at Saratoga station from North Creek at 9:16AM. There was good ridership on the... (more)