A westbound Atchison Topeka & Santa Fe Railway freight train passes the Fullerton station behind SD45 5508 (ex-ATSF 1808), mated with an F45, an SD26 and another SD45. (Fullerton, California – ... (more)
There is a lot going on here, so stay with me: For four days in late December (the 26th through the 29th), Metrolink had their entire commuter train system shut down. Much of this was because Lo... (more)
Locomotives representing both sides of the Southern Pacific/Union Pacific merger hustle the LA-bound Swift RoadRailer through Cougar, California in summer 1998.