The non-self-propelled snow blower Xrot mt # 95404 was delivered by the company Zaugg in Eggiwil in 2011. With its two 450 kW diesel engines, it can blow away up to 8500 tons of snow per hour, up ... (more)
The snow clearing train of the Rhaetian Railway from Pontresina arrives at Alp Grüm after clearing the line to Cavaglia. There has been up to one meter of snow in this area in the last few days. ... (more)
"Allegra" ABe 8/12 # 3503 of the Rhaetian Railway in Pontresina with train 4621 of the line R19 from St.Moritz to Tirano. In front is the track plough Xk # 9143, operated by an employee ... (more)
"Allegra" ABe 8/12 # 3505 of the Rhaetian Railway is entering Ospizio Bernina station on 2253 meter a.s.l. with train RE 1625 from St.Moritz to Tirano. In the last days, more then 1 mete... (more)
Snow Covered Great Divide
Heavy snow covers the eastern slope along the Indian Peaks and Rollins Pass. Daily oil sure helped make a pleasant shot in knee deep new snow.